The project commenced commercial operation in August 2012 at an installed capacity of 10.2 MW. The expected annual energy generation is 30.1 GWh per annum.
This project is located in Kalpitiya peninsula in Puttalam district. The installed capacity of the project is 10.2 MW comprising 12 turbines of 850 KW each supplied by Gamesa. The hub height and rotor diameter of the turbines are 65 m and 58 m respectively.
The project commenced commercial operation in June 2013 at an installed capacity of 5.1 MW. The expected annual energy generation is 15.3 GWh.
This project is also located in Kalpitiya Peninsula in Puttalam district in close proximity to Pawan Danavi project. The project comprises six turbines of 850 KW each supplied by Gamesa.