The 52.2 MW thermal power plant set up by Raj Lanka Power Company Limited is located in Rajshahi district in Bangladesh approximately 200 km from Dhaka. The plant is designed to use Heavy Furnace Oil (HFO) as the main fuel and Diesel can be used as a back-up fuel. The facility includes six complete HFO/Gas based reciprocating engines (Wärtsilä 20V32) each coupled with a generator (ABB AMG – 11.115MVA). The plant commenced commercial operation in January 2014.
The 52.2 MW thermal power plant set up by Lakdhanavi Bangla Power Limited is located in Comilla district in Bangladesh approximately 100 km from Dhaka. The plant is designed to use HFO as the main fuel and Diesel can be used as a back-up fuel. The facility includes six complete HFO/Gas based reciprocating engines (Wärtsilä 20V32) each coupled with a generator (ABB AMG – 11.115MVA). The plant commenced commercial operation in January 2015.
The 114 MW Heavy Furnace Oil (HFO) based thermal power plant set up by Feni Lanka Power Limited is located in Feni district in Bangladesh approximately 175 km from Dhaka. The facility comprises six 18V50 and one 20V32 reciprocating engines of Wärtsilä, Finland and seven generators from ABB, Finland. The plant commenced commercial operation in November 2019.